Dudhichua Project

Home / Dudhichua Project

Sh. Bipin Kumar

DESIGNATION : Area General Manager

EMAIL-ID : gmdch.ncl@coalindia.in

CONTACT NO. : 8004945702

Overview :

Dudhichua Opencast Coal Mine is one of the largest coal mine of NCL with a sanctioned capacity of 20 Million Tonnes. The Dudhichua Coal mine was started in 1982 and the coal production began from 1987.

Being a Basket linkage mine Dudhichua Mine has been entrusted with a greater responsibility in NCL for meeting any shortfall of Coal Production of other mines of NCL linked to the pit head power stations of M/s NTPC &M/s UPRVUNL in Singrauli Coalfields as well as distant power stations of Western & Northern India.

Project Information:-

Year of Few Important Events

Year of Opening of Mine

1982

Starting of Mining Operation (OB Removal)

1982-83

Starting of Coal Production

1987-88

Date of Commissioning of First Dragline (JYOTI)

01.09.1991

  • Dudhichua Project for 5 MTY capacity was sanctioned by Govt of India in Feb’84 for an investment of Rs 289.68 Crores.
  • With the increased demand of coal from Singrauli Coalfields, Dudhichua OCP was sanctioned by the Govt. on 25.8.1992 for 10 MTY with a capital investment of Rs.868.93crores.
  • NCL Board has approved the expansion project report of 15 MTPA in 131st meeting held on 28.07.2008 at an additional initial capital outlay of Rs. 326.57 crores.
  • The project is linked to western India power station through Basket linkage. As NTPC has interlinked Dudhichua Railway siding with the MGR of NTPC, this project will serve a Basket Linkage mine for pit head power station of NTPC to meet any shortfall from any respective linked mines.>
DUDHICHUA OCP(10 MTY)
Date of sanction 25th Aug 1992
Capacity 10 MTY
Total investment 1267.97 Cr.
Project completed March 2004
Mineable Reserve 344.96 MT
Total OBR 1133.41 MCum
Avg. Stripping Ratio 3.29 cum/Te
Manpower 3018
SQuality of Coal C&E (Gr.7 & Gr.10)
OMS 14.14 Te
Land 1752 Hac
Depth of Quarry 300m
The Phase wise Growth of Dudhichua Mine is tabulated below:-

PHASE- I for 5 MTPA

Particulars

Details

Preparation of Feasibility Report by CMPDI

August, 1982

Project Sanction by Govt. of India vide letter no. CPP/43011/48/81

27.02.84

Total Capital Outlay

Rs. 289.68 Crores

Project Completion date at a capital cost of Rs. 417.74 Crores

31.03.1993

World Bank assistance

US $ 151 Million

PHASE – II for 10 MTPA (Additional 5 MTPA)

Preparation of Project Report by CMPDI

December, 1989

Project Sanction by Govt. of India

25.08.1992

Total Capital Outlay

Rs. 868.93 Crores

Scheduled Date of Project Completion

March,1998

World Bank assistance finalized

March, 1998

Revised Cost estimate (RCE) prepared due to project completion delay (Time overrun) due to fund constraints resulting into cost overrun.

Rs. 1281.39 Crores- December 2000

RCE approval by GOI vide letter No. 43011/35/99-CPAM

26.03.2001

Project Completion Date at a capital cost of Rs.1267.97 Crores

31.03.2004

PHASE-III for 20 MTPA (10 to 20 MTPA)

Preparation of Expansion Project Report by CMPDI

February ,2017

Project Sanction by CIL Board

25.11.2017

Additional Capital Outlay

Rs. 1255.17 Crores

Scheduled Date Of Completion

31.03.2022

HEMM Details :

Equipment

Capacity

Existing (as on 01/05/2020)

Dragline

24 Cum

04

Shovel

10 Cum

9+4*

20 Cum

1

12 Cum

1

Dumper

120 Te

7+26*

100 Te

35+14*

85 Te

6+4*

Water Tanker

70 KL

6

28 KL

4

22KL

6+2*

Dozer

320 HP

1

410HP

8+6*

590 HP

2

770 HP

4+1*

450 HP

3

Drill

160 mm

7

250 mm

6+2*

311 mm

4

Grader

280 HP

6+1*

270 HP

1

WELFARE & CSR RELATED INFORMATION :

A.INFRASTRUCTURES STATUS OF HOUSING AT DUDHICHUA PROJECT
TYPE OF QUARTER SECTOR -A SECTOR-B&C
D Type NIL 46
C Type 24 84
B Type 116 804
M.Q. 420 802
TOTAL 645 1734
TOTAL HOUSING 2379
B.EDUCATION FACILITIIES
Schools Nos
DAV Public School 01
Saraswati Balika Shishu Mandi 01
Government Primary School 01
C.MEDICAL FACILITIES
Dispensary Sector A 01
Dispensary Sector B&C 01
Doctors 04
Bed 02
Nurse/Matron 01
Pharmacist 04(01 Ayurvedic)
Dresser 02
Dispensary Sector B&C 01
Ambulance 02
D.RECREATION FACILITY
Workers' Club 03
Central Library 02 (01 Sector A & 01 Sector B
Post Office 01
Bank 02
ATM 05
Canteen 05

SAFETY (ACCIDENT / INCIDENT IN YEAR 2015)

  TYPE  JUNE PROGRESSIVE
DEPARTMENTAL CONTRACTUAL DEPARTMENTAL CONTRACTUAL
MINOR INJURY NIL NIL NIL NIL
REPORTABLE NIL NIL NIL NIL
SERIOUS/td> NIL NIL NIL NIL
FATAL/td> NIL NIL NIL NIL

Manpower :

NO. OF EXECUTIVE NO. OF MONTHLY RATED NNO. OF DAILY RATED
209 372 1629
The Physical and Financial performance of Dudhichua Mine for the last 3 years is tabulated below:-

Particulars

2019-20 (Prov.)

2017-18

2018-19

Coal Production(MT)

17.679

15.5

15.5

OB(Removal)Departmental (M. Cum.)

15.834

14.06

16.236

OB(Removal)Outsourcing (M. Cum.)

42.013

28.17

36.073

OB(Removal) Total  (M. Cum.)

68.896

42.23

523.09

Manshifts(Lakhs)-Total

5.94

6.48

5.93

OMS(Tonnes)- Total

34.21

30.74

23.6

OMS(Tonnes)- Dept.

13.35

12.86

10.74

EMS (Rs.)

5854

6004.76

5338.35

Explosives (Rs./Te.)

54.48

54.59

45.42

P.O.L (Rs/Te.)

69.41

70.48

58.23

Powder Factor -Coal (Tes.)

5.77

6.23

5.93

Powder Factor – OBR-Dragline

1.65

1.7

1.68

Power Factor – OBR- Shovel

2.00

1.73

1.68

Specific Consumption(lit./Cum.)- Diesel

1.04

.99

1.09

Specific Consumption (KWH/Cum.)- Power(Total)

2.37

.03

2.46

Cost Per Tonne(Rs./Te.)

814.55

852.31

817.35

Sale Value Per Tonne (Rs./Te.)

1305.92

1336.18

1083.36

Bonus from Customer (Rs./Te.)

141.41

144.71

153.33

ProfitPerTonne (Rs./Te.)

632.79

628.57

419.34

Total Profit (Rs. Crores)

1118.7028

974.29

ACHIEVEMENTS :

  • OVERALL WINNER OF ANNUAL WELFARE COLONY COMPTETION IN YEAR 2012-13 , 2013-14 AND ALSO IN YEAR 2014-15.
  • 1st PRIZE IN WELFARE COLONY COMPTETION
  • Dudhichua project won “Swargiya Shankar Dayal Smariti” award for Rajbhasha in year 2014.
  • Special package of two land oustees one having more than 2 acres of land and another having less than 2 acre of land clubbing and making 4 acre or more of land altogether and two employment, one each to both land oustees is released.
  • Inter Area Table Tennies competition was organized successfully in year 2014-15.
  • Inter Area Cultural Meet competition was organized successfully in year 2014-15.
  • SWACH VIDAYALAYA ABHIYANDISTT.- ANUPPUR (M.P).
  • TOTAL TOILETS TO BE CONSTRUCTED – 589 NOS.